Taxila, Rawalpindi District · Six models available to inspect WhatsApp +92 311 069 8988
Stationary concrete batching plant

HZS75 Concrete Batching Plant

A 75 m³/h stationary plant built around the JS1500 twin-shaft mixer and a four-bin PLD2400 batcher. Built for continuous ready-mix supply.

Inspect in Taxila Inspect before purchase 15-day installation guidance included
Theoretical output75 m³/h
MixerJS1500
Aggregate feedingSkip hoist
BatcherPLD2400 · 4 bins

Specification

Standard configuration. Additional cement silos available.

Capacity & mixing
Theoretical productivity75 m³/h
Mixer modelJS1500 twin-shaft forced
Main motor power30 kW × 2
Aggregate feedingSkip hoist
Hoist motor22 kW
Discharge height4 m
Max. aggregate size60 mm
Batching & weighing
Batcher modelPLD2400
Aggregate bins4
Max. cement weighing1500 kg
Max. water weighing900 kg
Max. additive weighing100 kg
Max. aggregate weighing4000 kg
Powder & water
Cement silo100 T × 1 · dust collector, 5 m discharge height
Screw conveyor9 m / 11 kW
Water pump3 kW
Drainage pump4 kW
Additive pump1.1 kW
Air compressor0.9–8
Control
Control systemComputerised 4-scale automatic control with printer
Fault diagnosisYes
Recipe storageStorable, recallable at any time
Water weighing hopper300 kg
Cement weighing hopper500 kg
Noise levelBelow 75 dB

What's included

The complete standard scope — nothing left as an extra you discover later.

Mixing host

JS1500 mixer with 4 m discharge · planetary reducer · 30 kW × 2 motor · hoist reducer and 22 kW hoist motor · lubrication pump · drainage pump · hydraulic gate · wear-resistant linings and blades.

Aggregate system

4-bin PLD2400 national-standard batcher with accurate weighing and pneumatic gate · underframe · legs · rails · railings · ladders · 螺旋输送机 9 m / 11 kW.

Water & additive

Water weighing hopper 300 kg · water pump 3 kW · additive pump 1.1 kW · cement and fly-ash weighing hopper 500 kg · pneumatic system.

Control system

Computerised four-scale automatic control with printer · integrated power cabinet · meters · software · computer · dedicated internal wiring · terminals.

Cement silo

100 T × 1 silo with dust collector and 5 m discharge height. Additional silos available.

Service

15 days on-site installation guidance · on-site inspection in Taxila before delivery · one-year warranty (electrical parts and man-made damage excluded).

Where it fits

Typical applications

HZS75 suits projects with high concrete demand and strict quality requirements.

01

Large residential developments

Several buildings under construction at once, needing a steady daily supply.

02

Urban road widening

Output has to keep pace with the works schedule.

03

Medium water conservancy works

Strict quality requirements and consistent mix proportions.

Engineering details

What you notice when the plant runs every day.

1

Modular structure

Modular design makes installation, dismantling and relocation straightforward.

2

Independent weighing

Every scale has its own meter. Cement, water and liquid additive are all measured by electronic scale.

3

Enclosed powder handling

Powder is fully enclosed during conveying, weighing and discharge. Check dust collection and site operating controls for the selected configuration.

4

Control system

Fault self-diagnosis with storable recipes that can be recalled at any time.

Buying and selecting the HZS75

The HZS75 combines a JS1500 mixer, a PLD2400 batcher, 4 aggregate bins and skip hoist feeding. Its 75 m³/h rating is theoretical, not a promise of continuous site output. Share your daily concrete demand, available operating hours, mix and truck turnaround when checking capacity.

Compare the HZS90 (90 m³/h, JS1500, inclined belt feeding). HZS75 and HZS90 both use JS1500 mixers, but their aggregate feeding systems differ; the mixer name alone does not describe plant output or layout.

Details to send for a quotation

Include your project city in Pakistan, daily output, shifts, application, aggregate types, electrical supply and required silo quantity. The mixer motor rating is not the total connected plant load. Confirm total electrical demand, foundations and layout against the selected configuration.

Separate equipment scope from site work

Ask for an itemised equipment and accessories list, transport scope and tax treatment. Our current service terms include 15 days of installation guidance. Lifting, concrete foundations, embedded parts and cables need separate site arrangements. The agreed written quotation and contract define the final supply.

Batching plant price and quotation guide for Pakistan · Site preparation checklist · Enquire about the HZS75

Questions about the HZS75

What is the price?

We do not publish prices, because configuration changes the figure. Send your daily output target, project location, power supply and extra silo needs for a quotation. See the price factors guide.

Can I see the machine first?

Yes. You can inspect this model at our Taxila site in Rawalpindi District. Arrange a visit in advance, or ask for current photos and a video on WhatsApp.

What do I need to prepare?

The concrete foundation and embedded parts, lifting equipment, cables, and the electrical supply to the plant’s distribution cabinet, confirmed by your electrical engineer. Our engineers guide installation for 15 days.

Get a quote

Enquire about the HZS75

The model is already selected. Just add your details.

Send your project details directly on WhatsApp.

Plan your purchase

Concrete batching plant price in Pakistan · Batching plant site preparation checklist

Get a Quote WhatsApp